摘要本次设计的是忻州金庄煤矿60万吨采区设计。是在金庄煤矿井田概况和地质特征的基础上,结合搜集到的相关原始资料、运用所学知识、参考《煤矿开采学》、《煤炭工业和矿井设计规范》、《煤矿矿井开采设计手册》等参考资料,在侯千亮老师深入浅出的精心指导下独立完成。此次毕业设计是根据国家煤炭建设的有关方针、政策,结合设计矿井的实际情况,遵照采矿专业毕业设计大纲的要求,在收集、整理、查阅大量资料的前提下,运用自己所学的专业知识和实践实习经验独立的系统的完成的设计。关键词:初步设计:开拓:综采放顶煤:固定式矿车Xinzhou Jinzhuang Coal Mine 4 Mt/a New Shaft DesignABSTRACTThis design pertains to the 600,000-ton mining panel for the Xinzhou Jinzhuang CoalMine.It was independently completed based on the general situation and geologicalcharacteristics of the Jinzhuang Mine field,incorporating collected relevant raw data,applying acquired knowledge,and consulting reference materials such as "Coal MiningScience,""Design Specifications for Coal Industry Mines,"and the "Coal Mine MiningDesign Handbook."The completion of this graduation project benefited greatly from theinsightful and meticulous guidance of Teacher Hou Qianliang.This graduation design was developed in accordance with the relevant national policiesfor coal construction,considering the actual conditions of the designated mine,and adheringto the requirements outlined in the graduation design syllabus for the mining engineeringmajor.It represents an independent and systematic design effort,undertaken by applyingprofessional knowledge and practical internship experience,following the collection,consolidation,and review of extensive information.KEYWORDS:preliminary design;development;fully mechanized top-coal caving;fixed-type mine carII目录摘要…ABSTRACT.第一章井田概况和井田地质特征第一节矿区概况…一、交通位置二、地形地貌三、矿区的工农业生产建设概况四、矿区电力供应基本五、河流水系..2六、气象及地震情况第二节井田地质特征及煤层特征3一、地层3二、构造6第三节煤层埋藏特征8一、含煤性.8二、可采煤层…P第四节水文地质13一、含水层.13二、隔水层….14三、矿井充水条件15四、井田及周边地区老窑水分布状况….18五、水文地质类型划分21第二章井田境界与储量22第一节井田境界22第二节地质储量计算…22一、资源储量估算指标22二、资源储量估算方法.22三、资源储量估算参数…22III四、煤层采用厚度确定原则.….22五、资源储量估算结果23五、矿井设计可采储量24第三章矿井工作制度及生产能力..26第一节矿井工作制度..26第二节矿井生产能力及服务年限…26第四章井田开拓。27第一节井田开拓方式确定27第二节达到设计生产能力时工作面设备28一、回采工作面主要机械设备配备详见表….28二、采煤工作面长度、年推进度和生产能力计算..28三、综掘工作面主要设备表见表4-2-3.30四、井巷工程量.30第五章矿井基本巷道及建井计划.32第一节井简、石门与大巷….32第二节井底车场.….34第三节建井工作计划…...35一、施工准备的内容与进度.35二、矿井移交方式与移交标准..35二、巷道掘进进度指标.36三、掘进工作面个数及主要机械设备.36四、井巷工程量37五、三类工程施工组织原则….38六、建井工期预计….39七、加快建井速度的措施及建议.39第六章采煤方法。40第一节采煤方法的选择.。40一、采煤方法的选择40二、采煤工作面设备选型.40
暂无评论内容