The Construction Organization Design ofTheXiangshan town No.21 Building in FuzhouAbstractThe construction organization design according to the engineering characteristics andvarious specific conditions of the construction,scientifically draw up the construction plan,determine the construction order,construction method and technical organization measures,and arrange the construction progress.The construction personnel can organizeconstruction according to the corresponding construction method under the control of theprogress plan,and ensure that the proposed project is completed according to therequirements of the contract.The compilation of construction organization design is the coreof all works in the stage of concrete construction preparation.The construction organization design of this unit is divided into eight chapters,whichare the general situation of the project,the construction plan,the calculation book of theengineering quantity,the construction preparation,the construction deployment,theconstruction schedule plan,the construction plane arrangement and the safe construction.By familiar with the design data and drawings,the whole quantity of the project is estimated,and the relevant requirements and specifications of the budget quota are combined,theconstruction order is properly arranged,the mechanical equipment is fully utilized,thelabor efficiency is improved,the safety of the field,the civilized construction and theenvironmental protection are organized so as to ensure the safety and quality of the project.The project is designed for the construction of the 21#building in Fuzhou XiangshanTown,located in Fuzhou,Fujian Province,with a total area of about 2748.4 square metersand a building area of 481 square meters.The superstructure system:reinforced concreteframe structure.This project is a seven storey high-rise residential building with atemporary overhead parking.The maximum number of buildings is 20.5 meters,and thenumber of households is 671.According to the requirements of the graduation design,combined with the specificconditions of the project and the relevant specifications,regulations,and other data,the unitengineering construction organization design document is compiled.A scientific constructionorganization design will make the construction activities coordinated and orderly,improvework efficiency,shorten the time limit,reduce the cost,create quality effect,and compete forthe outstanding projects of tTaking the construction project as an example,combining withthe actual situation,the basic theoretical knowledge of the project construction plan isdesigned and applied in detail.From the point of view of the project manager,the progressplanning and design of the project from the start to the completion of the completion andacceptance of the project is carried out,and the cross road map is used.The progress plan isanalyzed,and the concrete measures are put forward according to the actual situation:quality and safety,strict tec
暂无评论内容