六层框架结构图书馆施工组织设计摘要:本项目为六层框架剪力墙图书馆施工组织方案,工程项目占地总面积为4.37公亩。图书馆一期工程主体(图书馆裙楼)总建筑面积为330002,局部配有地下人防工程,地面上五层、局部六层,一层、顶层层高为4.2m,其他每层设计标高为4.8m,工程建筑总高度为30.6m。关键建筑做法:内外墙喷漆,外墙面砖,楼地面为地砖、彩色水磨石,阶梯为大理石路面,顶篷为轻钢龙骨吊顶、喷漆,门有实木门、防火门窗、铝合金门窗、铝合金门窗、卷材防水屋面。关键词:六层框架结构:图书馆:施工组织设计Construction organization design ofsix-story frame structure IibraryAbstract:Abstract:This project is the construction organization scheme of a six-storyframe-shear wall library.The project covers a total area of 4.37 hectares.The main body ofthe first phase of the library project (the library podium)has a total construction area of33000m2,with civil air defence works in some areas.There are five floors above the groundand six floors in some areas.The height of the first floor and the top floor is 4.2m,the designelevation of other floors is 4.8m,and the total height of the project building is 30.6m.Keybuilding practices:paint the interior and exterior walls,tile the exterior walls,floor tiles andcolored terrazzo,marble pavement on the stairs,light steel keel ceiling and paint on theceiling,solid wood doors,fireproof doors and windows,aluminum alloy doors and windows,aluminum alloy doors and windows,and coiled material waterproof roof.Keywords:six-story frame structure;Library;construction management plan目录第1章工程概况。1.1工程设计概况1.2施工现场特征1.3工程特点….2第2章施工部署.32.1施工段划分….32.2施工程序、施工进度控制点、施工进度控制计划32.3施工组织管理、劳动力计划….3第3章工程量计算..63.1施工准备…63.2临时供水计算公式…63.3临时设施规划.73.4施工平面布置图.….8第4章主要分部分项工程施工方法.94.1地基与基础工程.94.2主体工程….104.3屋面工程..14第5章质量目标计划.16第6章各项技术保证措施196.1冬季施工措施.….196.2雨季施工措施..196.3土建安装协调施工的措施…206.4保证工程进度的措施.…206.5保证质量的措施206.6安全施工的技术措施…21第7章文明施工管理237.1文明施工管理体系.237.2文明施工管理措施。237.3环境保证措施237.4成品保护237.5施工部署.247.6主要项目的施工方法.247.7质量要求267.8安全措施26第8章建筑电气安装工程278.1电气概况278.2施工条件278.3程序…288.4施工方法.,288.5质量检查标准.308.6主要劳动力、材料、施工机具计划31第9章结论….33致谢….34参考文献35附录…37附录:施工布置图37附录:施工进度网络图」.38附录:工程量计算..38
暂无评论内容