7.3万吨年粗苯加氢精制工艺设计

第1页 / 共52页

第2页 / 共52页

第3页 / 共52页

第4页 / 共52页

第5页 / 共52页

第6页 / 共52页

第7页 / 共52页

第8页 / 共52页
试读已结束,还剩44页,您可下载完整版后进行离线阅读
7.3万吨年粗苯加氢精制工艺设计-知知文库网
7.3万吨年粗苯加氢精制工艺设计
此内容为付费资源,请付费后查看
10
限时特惠
20
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源
© 版权声明
THE END
目录AbstractThe main task of this design is to design the crude benzene hydrofining processwith a processing capacity of 73,000 tons/year.The process flow of solventextraction and low-temperature hydrofining is adopted.For this reason,the chemicalequipment of continuous distillation sieve plate column is selected.By separating the light and heavy components in the two benzene towers,the recovered heavy benzene is operated in the tower kettle,and the hydrogenation reaction is used to remove the hydrogen sulfide and ammonia gas from the light benzene raw materials,and the process products are continuously passed into Among the pre-rectification tower,extractive distillation tower pure benzene tower and xylene tower,after the above operations,the crude benzene raw material was purified in multiple steps toobtain qualified pure benzene and pure toluene and other products.In this design,in order to obtain the parameters required by the design,in order to meet the design requirements in the design process,during the design process,the materials,heat,the specific process size of the tower were calculated,and all the towerswere calculated.The load performance of the plate is calculated.After calculating the operation of various other equipment,all the parameters required in this design areobtained,including the amount of feed,the liquid flow at the top of the tower,the liquid flow at the bottom of the tower,the diameter of the tower,the height of the tower,and the distance between the plates,The actual number of plates in the rectificationsection,the number of plates in the distillation section,etc.are 109.5Kmol /h,92.682Kmol /h,16.639Kmol /h,1.6m,24.45m,0.46m,17 pieces,17 pieces,and The number of manholes is set to 7,the numerical value of the plate spacing between the manholes is 0.7m,and the numerical value of the plate spacing at the feed is 1mKeywords:low temperature hydrotreating:perforated continuous distillationtower;two benzene tower:benzene:toluene2
喜欢就支持一下吧
点赞0 分享
评论 抢沙发
头像
欢迎您留下宝贵的见解!
提交
头像

昵称

取消
昵称表情代码图片

    暂无评论内容