内蒙古农业大学经济管理学院本科毕业论文Abstract30 years of reform and opening up,the construction industry output valueincreased by 20 times,the proportion in national economy is gradually increased,from the initial3.8%in 1978to 7%now;in addition,more than half of our country'sinvestment in fixed assets is by the construction industry to form new productivity oruse value.This shows our country engineering construction enterprise is confrontedwith hitherto unknown development opportunity,but the construction of competitionbetween enterprises is still intense,demand situation still did not change.This articleaccording to the project cost control theory,from the analysis of the Inner Mongoliahundred Thai Railway Construction Engineering Limited by Share Ltd in project costcontrol present situation,the cost control of design stage performance,and otheraspects of the existing problems are analyzed,aiming at the existing problems,fromthe design,process control and management system and performance appraisal andincentive mechanism are put forward optimization design and implementation ofsecurity measures,thus enabling enterprises to realize the full,the whole process ofproject cost management and control,total factor.Key Words:100 Thai companies;project cost;controlDirected by:Applicant for Doctor degree:(College of Mechanical and Electrical Engineering.Inner Mongolia Agricultural University.Hohhot 010018.China)2
暂无评论内容