AbstractIn China,the bill of quantities of construction engineering includes the list ofmeasure items,divisional items,subdivisional items and other items.The constructionbill of quantities shall be prepared by the tenderee or bidding agent with bidevaluation ability and the project coconsultant with corresponding qualificationaccording to the unified calculation rules,unified project name,unified measurementunit and unified project code.These lists of quantities and unit prices include the partslist,the parts list,the measures list from the expense list and the list of other item lists.Project cost is to integrate the total quantities into theconstructionconsumption quotaof Shandong Province,and to export the cost statements of each divisional andsdivisional project through GCCP cloud pricing software.The topic of this graduation project is a three-story framework teachingbuilding.The design includes:business bid,technical bid and conclusion.Thecommercial bid includes general introduction,decoration part and civil engineeringpart.When calculating the quantities,It is based on the rules for calculating theamount of "code for evaluating videos of construction projects"in Shandong.,and theengineering cost of the project is obtained by using the quota set price of consumptionof construction projects in Shandong Province.The technical proposal includesproject overview,preparation basis,construction layout,organization plan,construction plan,construction schedule,resource supply plan,constructionpreparation,etc.KEY WORDS:bid documents,commercial bid ducuments,technical bid documents,construction design,construction scheme
暂无评论内容