AbstractGraduation is based in Xi'an Changqing Garden Office Building Project integrationbuilding works tender notes tender documents,contract conditions,technical specifications,drawings and other relevant documents and the preparation of tenders.The construction areaof 5893.36 square meters,the total cost of 6670742.24 yuan,each square meter cost 1131.98yuan,plans a total duration of 184days.The design includes:Business Standard,technical standards and conclusions.BusinessStandard,including civil engineering,decoration,installation,and integrated unit of analysis;Calculation rules for construction in strict accordance with "Application of Shanxi Provincefixed works"in the calculation rules to calculate project cost is the application of a fixed setof prices,in strict accordance with Shanxi Province valuation norms.Technology standard isfrom the human material,machine area to carry out a comprehensive layout ofconstruction,including the preparation of the basis for project overview,construction overallplan,construction preparation work,the main branch (sub-)construction method to ensure thequality of the technical organization measures to ensure the safety measures of technicalorganizations,to ensure that the construction of technical civilizations organizationalmeasures,product protection,reducing noise pollution and measures to ensure theconstruction period measures of technical organizations,winter construction measures,qualityproblems of the prevention measures,with photos List,from a technical,construction,materialsand adopt measures to ensure that the construction of the construction schedule,quality andconstruction safety and on this basis a reasonable lower the cost of construction.KEY WORDS bid documents;commercial bid ducuments;technical bid documents;engineering quantity;construction scheme.
暂无评论内容