厂房施工组织设计

第1页 / 共68页

第2页 / 共68页

第3页 / 共68页

第4页 / 共68页

第5页 / 共68页

第6页 / 共68页

第7页 / 共68页
试读已结束,还剩61页,您可下载完整版后进行离线阅读
厂房施工组织设计-知知文库网
厂房施工组织设计
此内容为付费资源,请付费后查看
1020
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源
© 版权声明
THE END
厂房施工组织设计摘要:此次大学毕业是指B#双层厂房,简单地包括了建筑的项目概况:前期设计梁、柱板规格,计算横截面合理化计算纵向横着承载力、风荷载等渠道及梁、支撑等计算:一乐架构内力计算与内力组成。在毕业设计中,我们将要应用四年所学的基础知识,通过调研分别的资料根据自己所学习的知识,处理此次毕业设计中遇到的困难,深层次把握构造计算的原则和整体框架的原理。本小组毕业设计的主题是《万载县多层厂房设计》。毕业设计期内根据对《结构力学》《钢筋混凝土》《建筑结构抗震设计》等书的学习培训查找,在网络上查找了《抗震规范》《混凝土规范》《荷载规范》的负载配备规范标准。并通过所学的基础理论、专业技能开展建筑和总体设计,将建筑草本植物根据浩辰CD,进行施工图纸合理布局框架剪力墙,根据PKPM进行框架图制作,根据CAD截屏正确引导WORD手机软件将CAD图裁切成本费WORD文本文档。本次毕建是双层工业园厂房设计,选用浩辰CAD、PKPM等辅助计算机,但是由于本身水平有限,在手工制作计算环节中有可能出现一些偏差,期待提供指导。关键词:框架结构:框架结构设计;建筑设计;配筋设计Workshop construction organizationdesignAbstract:This university graduation refers to the B#double-decker factory building,which simply includes the general situation of the building project.Design the specificationsof beam and column slab in the early stage,calculate the cross section,rationalize thecalculation of longitudinal transverse bearing capacity,wind load and other channels,beamsand supports;Internal force calculation and internal force composition of yile architecture.In the graduation project,we will apply the basic knowledge we have learned in fouryears,deal with the difficulties encountered in this graduation project according to our ownknowledge through investigation and study,and deeply grasp the principles of structuralcalculation and overall framework.The theme of this group's graduation project is"Design of Multi-storey Factory Buildingin Wanzai County".During the graduation design period,according to the study and training ofbooks such as Structural Mechanics,Reinforced Concrete and Seismic Design of BuildingStructures,the load allocation standards of Seismic Code,Concrete Code and Load Code weresearched on the Internet.And through the basic theory and professional skills,the architectureand overall design are carried out.According to Haochen CAD,the architectural herbs arerationally laid out in the construction drawings,and the frame drawings are made according toPKPM.According to the screenshot of CAD,the WORD mobile phone software is correctlyguided to cut the CAD drawings into WORD text documents.This Bi Jian is a factory building design for a double-deck industrial park,and auxiliarycomputers such as Haochen CAD and PKPM are selected.However,due to its limitedlevel,there may be some deviations in the manual production and calculation,and we lookforward to providing guidance.Keywords:frame structure;Frame structure design;Architectural design;Reinforcementdesign目录第1章绪论1.1设计规模.1.2建筑做法」1.3门窗…第2章荷载计算2.1初步估计梁柱截面..52.2荷载计算…6第3章水平荷载作用下的框架内力分析.133.1梁线刚度..133.2框架柱侧移刚度.133.3水平地震作用分析.153.4横向地震作用计算..153.5验算框架层间弹性位移角…163.6水平地震作用下框架柱剪力和弯矩计算.163.7横向风荷载作用下框架结构内力和侧移试算,20第4章竖向荷载作用下框架内力分析.…,244.1恒荷载试算.244.2梁柱转动刚度计算..28第5章横向框架内力组合:.335.1框梁内力组合:.335.2框架梁内力组合:33第6章框架梁柱截面设计.…406.1框架梁..406.2框架柱436.3受压计算…446.4轴压验算466.5受剪计算466.6配置钢筋476.7楼板设计496.8楼梯设计546.9平台板.556.10平台梁设计566.11承台设计计算59致谢61参考文献62附录附录:施工布置图.1附录:施工进度表.2
喜欢就支持一下吧
点赞0 分享
相关推荐
评论 抢沙发
头像
欢迎您留下宝贵的见解!
提交
头像

昵称

取消
昵称表情代码图片

    暂无评论内容