摘要本次毕业设计题目为南宁职业技术学院办公楼工程招标控制价的编制,建设地点位南宁市职业技术学院。建筑面积为:2646.84m2。本建筑总共4层,室外地坪为-0.47米,建筑高度为16.5米。编制依据:(1)本工程施工设计图纸及相关的标准、规范、技术资料。(2)《建设工程工程量清单计算规范》(GB50854-50862-2013)及广西壮族自治区实施细则。(3)广西壮族自治区建设行政主管部门颁发的2013年《广西壮族自治区建筑工程消耗量定额》、《广西壮族自治区装饰装修工程消耗量定额》、2016年《广西壮族自治区建设工程费用定额》及其补充定额、计价相关规定。(4)自治区建设工程造价管理总站文件《关于调整除税价计算适用增值税税率的通知》桂造价[2018]14号文件(5)材料价格:信息价采用《南宁建设工程造价信息》2022年第6期下半月刊。关键词:士木工程框架结构:招标控制价IIIBidding control price of complex building projectStudent:Teacher:The topic of the graduation design is thecompilation of the bidding control priceof the offce building project of NanningVocational and Technical Collegeand the construction location is Nanningvocational and Technical CollegeConstruction area:2646.84m2.The building hasa total of 4 floors,the outdoor floor is-0.47 meters and the building height is 16.5meters.Compilation basis:(1)Construction design drawings of the project and related standardsspecifications and technical data(2)Specifcation for Calculation of Bill of Quantities of ConstructionProjects(GB50854-50862-2013)and Implementation Rules of Guangxi ZhuangAutonomous Region.(3)Guangxi Zhuang AutonomousRegion Construction EngineeringConsumption Quota,Guangxi Zhuang Autonomous Region DecorationEngineering Consumption Quota in 2013GuangxiZhuang Autonomous RegionConstruction Engineering Cost Quota in 2016 aswell as supplementary quotaand valuation regulations issued by the administrative department of GuangxiZhuang Autonomous Region construction(4)Autonomous Region Construction project Cost Management Stationdocument"Notice on Adjustment of Tax Excluding Price Calculation ApplicableVAT Rate"GUI cost[2018]No.14 document(5)Material price:The information price adopts the second semi-monthly ofNanning Construction Project Cost Information,the 6th issue of 2022Key words:Civil engineering;Frame structure;Bidding control priceIV目录1.招标控制价封面......2.招标控制价.·。。。。。。。。。。。。。。e。。。。。。。。。。。。。。。》2.1总说明...32.2建设项目招标控制价汇总...…42.3单项工程招标控制价汇总表.·62.4单位工程招标控制价汇总表.…62.5分部分项工程和单价措施项目清单与计价表......72.6工程量清单综合单价分析表...............132.7总价措施项目清单与计价表........2.8其他项目清单与计价汇总表..…...232.9税前项目清单与计价表..........332.10规费、增值税计价表......342.1承包人提供主要材料和工程设备一览表...........353.结论...384.致谢........…395。参考文献.…附录1.…41附录2...….53
暂无评论内容